1.Begin to lay a tile from the center of floor, where Your two adjusted certificate lines intersect. Began, laying a tile in crossing of lines, after use lines as guide, as you work the way, outwardly-directed to the walls in every sector.

November 12, 2009

Preparation works Installation of ceramic tile starts from preparation works. First the faced areas are being measured to find out the quantity of tile and other materials. At floor measurement the angels are checked first. If they are not equal, consider the quantity and location of incomplete tiles in places adjoining to the walls. Note